The Renova Foundation officially delivered to the local authorities of Colatina an alternative water withdrawal structure to supply the municipality. The new water pipeline, installed in the Santa Maria River, can meet around 50% of the demand of the Southern part of Colatina and should be put in operation when the turbidity of the water from Doce River, the largest water source in the town, changes.
NEW WATER PIPELINE IN COLATINA
Published in: 04/11/2017
×